Oklo Inc. is an American company developing advanced nuclear power plants and nuclear fuel recycling technologies. Founded in 2013 and headquartered in Santa Clara, California, it is best known for its proposed Aurora power plants, which use fast-reactor technology. Its business model centers on owning and operating plants and selling their electricity or heat, rather than primarily selling reactor equipment. The company became publicly traded in May 2024 through a merger with AltC Acquisition Corp.
Origins and corporate development
Oklo was founded by nuclear engineers Jacob DeWitte and Caroline Cochran. Its name refers to the prehistoric natural nuclear reactors discovered at Oklo in Gabon, where geological conditions sustained naturally occurring nuclear fission reactions about two billion years ago. The company is distinct from that geological site.
Its technology draws on experience with metal-fueled fast reactors, particularly the Experimental Breeder Reactor II, or EBR-II, which operated at Idaho National Laboratory’s predecessor site. EBR-II demonstrated aspects of sodium-cooled reactor operation, fuel recycling, and passive responses to certain abnormal operating conditions. That historical experience provides a technical foundation, but it does not itself establish the licensing or performance of Oklo’s proposed commercial plants.
In May 2024, Oklo completed its merger with AltC, a special-purpose acquisition company, and began trading on the New York Stock Exchange under the ticker symbol OKLO. The transaction provided a route to public markets and capital for technology development and prospective deployment.
Aurora reactor technology
Aurora is the name of Oklo’s proposed power-plant product family. Its central technology is a fast-neutron reactor: a nuclear reactor designed to sustain fission primarily with fast neutrons rather than slowing them substantially with a moderator.
This distinguishes it from the pressurized-water reactors widely used in commercial nuclear generation. Oklo’s designs use metallic fuel and sodium-based cooling technology. Sodium can transfer heat at high temperatures without the high coolant pressures characteristic of pressurized-water systems, but it also requires specialized engineering because it reacts chemically with air and water.
Aurora designs have evolved. The initial U.S. licensing application concerned a plant producing approximately 1.5 megawatts of electricity; later company plans described substantially larger units. Specifications and operating claims therefore need to be associated with a particular design version rather than treated as fixed characteristics of every Aurora plant.
The proposed plants fall within the broader field of small modular reactors, although individual designs may also be described as microreactors. Their intended advantages include relatively small generating increments, long intervals between refueling, and suitability for sites where large conventional nuclear stations would be impractical. These are design objectives, not a commercial operating record.
Safety approach
Oklo emphasizes passive and inherent physical responses intended to reduce dependence on active equipment and operator intervention. Such responses can include changes in reactor behavior as temperatures rise and heat removal driven by natural circulation.
These mechanisms do not eliminate the need for engineered safety systems, accident analysis, security, or regulatory review. Their effectiveness must be demonstrated for the specific fuel, core configuration, cooling system, and operating conditions of each proposed plant.
Fuel supply and recycling
Fuel availability is a central part of Oklo’s development strategy. Its plans include the use of high-assay low-enriched uranium, commonly abbreviated HALEU. This material contains more uranium-235 than conventional commercial light-water-reactor fuel but remains below 20 percent enrichment. Producing it requires specialized uranium-enrichment capacity and suitable fuel-fabrication facilities.
Oklo has also pursued access to material recovered from previously irradiated government reactor fuel at Idaho National Laboratory. Such access is distinct from having a completed, licensed fuel-manufacturing capability or sufficient fuel for a commercial fleet.
The company’s recycling work concerns the wider nuclear fuel cycle. Spent nuclear fuel retains uranium and other materials that can potentially be recovered and used in new fuel. Fast reactors can make use of some materials that conventional thermal reactors use less effectively.
Recycling does not make radioactive waste disappear. It changes the composition and distribution of waste streams and introduces additional requirements for chemical processing, material accounting, safeguards, worker protection, and eventual disposal. The feasibility of a recycling system depends on its particular process and regulatory framework.
Licensing history
In March 2020, Oklo submitted a combined license application to the U.S. Nuclear Regulatory Commission for its initial Aurora design at Idaho National Laboratory.
In January 2022, the commission denied the application without prejudice, citing insufficient information needed to complete its review. The identified gaps included information concerning potential accidents and the classification of safety-related structures, systems, and components.
“Without prejudice” meant that the decision did not prevent a future application. It was neither authorization to construct or operate the plant nor a finding that all fast-reactor designs were unacceptable. The decision applied to the application and supporting information then before the regulator.
Access to a government site, an agreement concerning fuel, or participation in a research program is separate from regulatory permission to construct and operate a commercial reactor.
Business model and proposed applications
Oklo proposes an owner-operator model in which customers purchase energy under long-term agreements. Potential applications include industrial facilities, remote installations, and data centers. Depending on plant configuration and location, nuclear heat could also support combined heat and power.
The economic proposition rests on providing sustained output without dependence on daily weather conditions. However, continuous generation still requires allowance for maintenance, refueling, outages, and backup arrangements.
As of its 2024 public listing, Oklo had not brought a commercial power plant into operation. Its deployment plans consequently depended on completing engineering, obtaining regulatory approvals, securing fuel, arranging financing, and demonstrating construction and operating performance. Proposed schedules, customer agreements, and projected generating costs were development commitments or estimates rather than evidence of completed commercial deployment.