A floating storage and regasification unit (FSRU) is a vessel or floating installation that receives liquefied natural gas (LNG), stores it in insulated tanks, and converts it back into gaseous form for delivery to a natural gas pipeline network. It combines much of the equipment of an LNG import terminal with a floating hull, usually moored at a jetty or offshore connection. FSRUs may be purpose-built or converted from LNG carriers. Their distinguishing function is regasification: a floating storage unit without regasification equipment requires a separate facility to produce pipeline-ready gas.
Role in the LNG supply chain
Natural gas is liquefied at an export facility so that it can be transported economically by sea. At approximately atmospheric pressure, LNG is kept near −162 °C, although its exact boiling temperature depends on composition. Liquefaction reduces its volume to roughly one six-hundredth of the equivalent gas volume, with the precise ratio depending on the reference conditions.
At the importing end, an FSRU provides three principal services:
- Receiving: transferring LNG from a visiting carrier through cryogenic loading arms or flexible hoses.
- Storage: holding LNG between cargo deliveries and withdrawals.
- Regasification and send-out: pumping and heating LNG, then delivering the resulting gas at the pressure and quality required by the receiving system.
The FSRU is only one part of the import infrastructure. A functioning project also needs a suitable berth or offshore mooring, gas export connections, metering, access for LNG carriers, and links to consumers. These associated facilities can determine the overall project schedule even when a vessel is available.
Unlike a floating production, storage and offloading vessel, an FSRU normally receives an already processed fuel rather than producing hydrocarbons from a reservoir.
Main systems and operating principles
Cargo containment and transfer
FSRUs use insulated cargo containment systems designed for cryogenic service. Common arrangements include membrane tanks supported by the hull and independent tanks with their own structural support. Containment design must accommodate thermal contraction, ship motion, and liquid movement within partly filled tanks.
A visiting LNG carrier may berth alongside the FSRU, or transfer LNG through a terminal arrangement connecting the vessels. Operations depend on acceptable wind, wave, current, and relative-motion conditions. Mooring systems, fenders, communications, and emergency-release equipment are therefore integral to terminal performance.
Storage capacity and regasification capacity are different measures. Storage capacity describes the volume of liquid that can be held; send-out capacity describes the rate at which gas can be supplied. A large tank inventory does not necessarily imply a high maximum send-out rate.
Pumping and regasification
LNG is generally pressurized while still liquid and then heated in vaporizers. Pumping a dense liquid to pipeline pressure usually requires much less mechanical work than compressing an equivalent quantity of low-pressure gas after vaporization.
The vaporizer supplies the thermal energy needed to bring the LNG to the required delivery condition. At sufficiently high pressure, the heating path may not include a distinct liquid-to-vapor boiling transition, although the industry still calls the process regasification.
A simplified steady-state energy balance for the heating stage is
where is the heat input rate, is the LNG mass flow rate, and and are the inlet and outlet specific enthalpies. Actual plant calculations also account for pumping work, heat losses, and auxiliary equipment.
Regasification systems are commonly distinguished by their heat source:
- Open-loop systems obtain heat from seawater, which is discharged at a lower temperature. Some designs transfer this heat through an intermediate fluid.
- Closed-loop systems obtain heat from an onboard heating circuit, commonly using fuel-fired equipment.
- Combined or hybrid systems can use different heat sources according to seawater temperature, environmental restrictions, and operating requirements.
These terms describe the regasification heating arrangement, not whether LNG storage tanks are open or closed. Heat exchangers, pumps, and controls must maintain adequate delivery temperature while avoiding icing and unsuitable thermal conditions.
Boil-off gas and utilities
Heat entering the cargo tanks causes some LNG to evaporate, producing boil-off gas. Depending on the vessel and its operating state, this gas can be used as fuel, compressed, recondensed into the LNG stream, or handled by other dedicated equipment. Routine management aims to control tank pressure without relying on atmospheric venting.
The vessel also requires electrical generation, cooling, instrument air, fire protection, and accommodation. Integrated process control coordinates cargo handling, tank pressure, vaporization, and gas export. Gas may require conditioning to meet the receiving network’s specifications for composition and heating value.
Configurations
Purpose-built and converted units
A purpose-built FSRU is designed from the outset for receiving, storage, and regasification service. Its layout can integrate vaporization equipment, utility systems, and long-term mooring requirements.
A converted FSRU uses an existing LNG carrier as its starting platform. Conversion adds regasification and export equipment and may require substantial changes to power supply, piping, structural supports, and safety systems. Its suitability depends on the original vessel’s condition, containment system, remaining service life, and available space.
Some FSRUs retain propulsion and can carry LNG between terminals. Others are intended primarily for long-term stationary service. The ability to relocate therefore varies between units and does not mean that every installation can be moved quickly or cheaply.
Jetty-based and offshore installations
At a jetty, the FSRU is connected to shore through loading arms or other engineered interfaces. Such installations often use the shelter and services of a seaport, but require sufficient water depth and space for cargo-transfer operations.
Offshore installations may use mooring buoys, turrets, or other arrangements connected to subsea pipelines. They can reduce dependence on a conventional berth, but introduce challenges involving offshore access, maintenance, vessel motion, and exposure to weather.
Development and deployment
Commercial shipboard LNG regasification entered service in 2005 at the Gulf Gateway project in the United States, an early milestone in the development of modern floating regasification systems. Subsequent projects expanded the use of permanently or semi-permanently moored FSRUs supplied by conventional LNG carriers.
FSRUs have been deployed to establish new LNG import markets, supplement existing terminals, meet seasonal demand, and respond to disruptions in pipeline supply. European interest increased sharply in 2022 as countries sought alternatives to Russian pipeline gas.
Their appeal rests partly on modularity: much of the terminal’s processing equipment can be built or converted in a shipyard, while marine and pipeline works proceed at the receiving site. Deployment speed nevertheless depends on vessel availability, permitting, local construction, and connection to the gas network.
Performance and economics
FSRUs are often chartered rather than owned by the gas importer. Project costs can include charter payments, fuel, maintenance, terminal works, pipeline connections, and operating services. A charter can reduce the initial capital required from the importing party, but creates continuing payment obligations.
Compared with a large land-based terminal, an FSRU may require less onshore construction and offer greater potential for redeployment. These advantages are site-specific. Long-duration, high-throughput projects may favor onshore facilities, particularly where larger storage inventories or future expansion are important.
Actual gas delivery depends on more than nominal vaporizer capacity. Relevant constraints include:
- Cargo arrival schedules and transfer rates.
- Usable LNG inventory and minimum operating tank levels.
- Seawater temperature or available heating capacity.
- Pipeline pressure and downstream demand.
- Equipment availability and maintenance requirements.
- Weather limits on LNG transfer.
An FSRU increases access to international LNG supplies; it does not itself guarantee that cargoes will be available or affordable.
Safety and environmental considerations
FSRUs combine marine hazards with those of a cryogenic gas-processing facility. Process safety addresses LNG leakage, extremely low temperatures, flammable vapor clouds, pressurized equipment, and potential ignition. LNG released onto unsuitable structural materials can cause brittle failure, while gas accumulating in an enclosed space can create a fire or explosion hazard.
Protective measures include gas and fire detection, emergency shutdown systems, spill management, ventilation, separation of hazardous areas, and controlled shutdown of transfer operations. Safety instrumented systems perform protective functions distinct from normal process control. Marine risks include collision, grounding, mooring failure, and damage to transfer connections.
Environmental effects depend on the design and location:
- Open-loop heating withdraws seawater and returns it colder, potentially affecting nearby marine conditions and organisms.
- Treatment used to control biological growth in seawater circuits may introduce additional discharge requirements.
- Fuel-fired heating and onboard power generation emit carbon dioxide and other combustion products.
- Methane leakage contributes to climate change, making gas-tight operation and boil-off management important.
- Dredging, pipelines, vessel traffic, noise, and lighting can affect surrounding habitats and communities.
An FSRU’s environmental footprint therefore includes both its own operations and the wider LNG supply chain, including gas production, liquefaction, shipping, and final combustion.